Hello, My Name is Rasoki nasution

no-image

Rasoki nasution Nasution

Scaffolding Specialist

CERTIFICATE OF COMPETENCY

FURTHER OFFSHORE EMERGENCY TRAINING (FOET) WITH EMERGENCY BREATHING SYSTEM (EBS) – 3 JAN 2025

TRAVEL SAFETY BY BOAT (TSBB) – 3 JAN 2025

CERTIFICATE OF OCCUPTIONAL HEALTH AND SAFETY - 2024

CERTIFICATE OF COMPETENCE NO. 061003144003481-2018 QC SCAFFOLDING

BNSP (INSPECTOR SCAFFOLDING)

CERTIFICATE OF ACHIEVEMENT ADVANCED SCAFFOLDING 

CERTIFICATE WORKING AT HEIGH LEVEL 2 MSTS ASIA

LPK WIRE ROPE TRAINING & CONSULTANCY (LEADERSHIP SCAFFOLER)

CERTIFICATE OF COMPETENCE OPERATOR SCAFFOLDING

SAFETY PASSPORT FOUNDATION INTERNATIONAL COMPEENCE WIRE ROPE

ADVANCED SCAFFOLDING INTERNATIONAL COMPETENCE WIRE ROPE

DT TC (BASIC RAGGING & SLINGING COURSE )

ALKON (SCAFFOLDING INSPECTOR)

AST (ADVANCED SCAFFOLDING) BATAM

AST (INTERMEDIATE SCAFFOLDING) BTAM

AST ( BASIC SCAFFOLDING ) BATAM

SAFECO INTERNATIONAL  (PELaTIHAN QC SCAFFOLDING) BATAM

 

WORK EXPERIENCE

PT OFFSHORE HIDROULIC INDONESIA

scaffolder (rig ensco 106) desember 2018-agustus 2019

job : drilling bintuni – papua – offshore (barge : ring ensco 106)

PT. NIPPON STEEL & SUMIKIN ENGINERING

scaffoder supervisor 12 april 2018- 15 may 2018

job : project kurushio base 1&2 batam - onshore

PT. CONNECT ENERGY SERVICES

scaffolding foreman (saipem) april 2018 – desember 2018

job : instalation platform wda&roa teluk bentuni – papua

 barge (hilong 106)

pt. connect energy services

rigger scaffolder (saipem) 01 july 2017 – 30 novermber 2017

job : rig maintanance drilling

barge : rig scarbeo 7 (balikpapan-offshore)

PT. TRILINK

scaffolder 01 april 2017 – 13 may 2017

job : mooring hook-up operation onboard jangkrik fpu deck–offshore

barge : arcadia ii

NEXELITE CP INDONESIA

scaffolder supervisor 08 agustus 2015-07 november 2016

yamal pmt

siemens batu ampar, batam - offshore

PT. SWIBBER

rigger scaffder 01 desember 2014 – 31 desember 2014

job : jacket installation total indonesia south mahakam – offshore

barge : resolute

NIPPON STEEL BATAM

foreman – scaffoder 01 februari 2004 – 30 november 2014 

primer oil total south mahakam

job : fabrication jacket and platform - onshore

PT. SOME INDONESIA

scaffoder agustus2004 – desember 2004

kerisi development project conoco philips offshore natuna

barge : support station 3

TEGUH KARYA TEKNIK

rigger scaffolder 21 februari 2000 – 20 september 2001

premier oil project

tanjung uncang – batam indonesia - onshore